All Solutions

Bar Free Footings

Replace conventional rebar cages in strip and pad footings with SteelX Rebar mixed directly into the concrete. Simplify formwork, eliminate rebar tying, and reduce footing construction time by up to 50%.

SteelX 5:25SteelX 8:45

The Challenge

Conventional rebar cages in strip and pad footings require detailed scheduling, skilled labour for cutting and tying, and precise placement on chairs within formwork. Rebar congestion in corners and intersections creates voids, reduces concrete consolidation, and slows construction. The result is increased cost, longer build times, and quality risks.

Our Approach

SteelX twisted steel fibres replace traditional rebar cages entirely. Dosed at the batching plant, the fibres distribute reinforcement uniformly throughout the footing — including corners and intersections where rebar placement is most problematic. The result is faster, simpler footing construction with more consistent structural performance.

Key Benefits

Eliminate rebar purchase, cutting, tying, and placement
Reduce footing construction time by up to 50%
Uniform reinforcement in corners and intersections
Better concrete consolidation without rebar congestion
Simplified formwork with no bar chairs or spacers needed
Reduced reliance on skilled steel-fixing labour

How It Works

1

SteelX Rebar is dosed at the batching plant based on engineering specifications

2

Concrete with fibres is delivered and poured directly into formwork

3

No rebar cages, chairs, or tie wire required

4

Standard vibration and finishing techniques ensure proper consolidation

Bar Free Footings — Case Studies

Real projects using SteelX to eliminate conventional bar in footings

Grammar College

— Forest Glen, QLD
Grammar College — strip footing pour with SteelX
Grammar College — pumping SteelX concrete into footing
  • Strip footings
  • 20 kg/m³ SteelX 5:25
  • All steel eliminated
  • Easy pumping

Industrial Foundation

— Caloundra, QLD
Industrial foundation — strip footing pour with SteelX
Industrial foundation — pile caps and strip footings
  • Bored piers — 20 kg/m³ SteelX 5:25 + 1N20
  • Strip footings — 20 kg/m³ SteelX 5:25
  • Pile caps — 20 kg/m³ SteelX 5:25 + SL102 T&B

Heavy Industrial Footings

— Smallwood Place, Murarrie, QLD
Heavy industrial footings — 580 m³ night pour overview
Heavy industrial footings — pumping SteelX into pad footing
  • 580 m³ pour in one night
  • 20 kg/m³ SteelX 5:25
  • All pumped
  • Steel used at areas of peak stress

Industrial Bored Piers

— Caboolture, QLD
Industrial bored piers — pouring SteelX concrete from agitator
Industrial bored piers — N24 bar placed in SteelX pier
  • 25 MPa
  • 15 kg/m³ SteelX 5:25 + 1N24 bar
  • Steel cage eliminated

Commercial Pad Footing

— Gold Coast, QLD
Commercial pad footing — excavation with starter bars
Commercial pad footing — completed SteelX pad
  • 10 kg/m³ SteelX 5:25
  • Cage eliminated

Industrial Strip Footings

— Aura, QLD
Industrial strip footings — pouring SteelX into trench
Industrial strip footings — excavated trench ready for pour
  • 20 kg/m³ SteelX 5:25
  • Cage eliminated
  • Dig and pour

LifePointe Church

— Maroochydore, QLD
LifePointe Church — excavated footings ready for SteelX pour
LifePointe Church — finishing SteelX pad footing
  • 20 kg/m³ SteelX 8:45
  • Removed all other steel

Ideal For

  • Residential strip and pad footings
  • Light commercial foundations
  • Retaining wall footings
  • Remote and regional projects where skilled labour is limited

Services We Provide

  • Structural engineering design and certification
  • Fibre dosage calculation for specific footing loads
  • Builder and concreter training for fibre concrete
  • Technical support during first pours

Ready to discuss this solution for your project?

Our team can help with specifications, mix designs, and project planning.